Click on an image below to view.
Treehouse and bridge we built and installed.
View from the 60′ suspension bridge.
View of the tree-zebo.
Sun shining through.
Tractor skidding logs to deck.
Before and after thinning.
Our water tender that we contract on wildfires.
Bridge construction and roadside brushing on Skywalker land.
Bridge planks 4×12 cottonwood from springtime removals milled on site.